Construction loan compliance is not one rule book. It is a mix of lender credit rules, state building laws and your own contract, and they all need to line up before your first payment goes out.
At Granny Flat Loans, we talk to borrowers Australia-wide about builds of all sizes. The ones who feel calm are the ones who understand how these three layers connect. This article walks through each layer so you can ask the right questions early.
What Does Construction Loan Compliance Cover?
A construction loan is not governed by its own separate law. It is regulated through general credit and prudential rules, while the payments it funds are shaped by state and territory home building laws.
That means a lender's rules and your builder's contract can both affect when money is released. Lender terms such as the number of drawdowns, repayment type during the build, time limits, inspection requirements and fees are set by each lender. Ask for these in writing before you commit. If you want an overview of how these loans work for secondary dwellings, our page on construction loans for granny flats is a good place to start.
How Do Serviceability Rules Apply to a Build?
Banks must assess whether you can meet repayments at an interest rate at least 3 percentage points above the loan's rate. This buffer applies to new borrowers, including those building.
APRA confirmed in May 2026 that the buffer remains at 3 percentage points. A prudent bank may also discount less stable income, such as bonuses or overtime, by at least 20 per cent. Non-bank lenders are not subject to APRA's rules, so their approach can differ.
The debt-to-income limit that restricts high-ratio lending does not apply to finance for the construction of new dwellings. That exemption does not remove the serviceability assessment, so your income and expenses still need to stack up. You can get a rough idea of where you stand with our borrowing capacity tool.
Interest-only repayment options during a build come with a trade-off. When a loan is interest-only, the bank must assess serviceability over the period when principal and interest apply, not the interest-only period. The principal is not reduced during that time, and repayments rise once the loan switches. Our page on interest-only construction loans covers this in more detail.
Deposit and Progress Payment Limits by State
Each state and territory sets its own limits on how much a builder can ask for upfront and how payments are staged. These limits matter because lenders commonly release funds in stages that follow the contract, but the drawdown terms are set by each lender, so confirm them in writing.
Here is how the main limits look as at November 2026:
In NSW, the maximum deposit is 10 per cent, and work over $20,000 needs a contract with a progress payment schedule. In Queensland, the maximum deposit is 5 per cent for contracts of $20,000 or more, and a builder cannot claim more than 50 per cent of the price until at least half the on-site work is done. In WA, the deposit is limited to 6.5 per cent for contracts from $7,500 to $500,000. In SA, the deposit is 5 per cent for work over $20,000. Tasmania allows 5 per cent for contracts of $50,000 or more. The Northern Territory's standard schedule caps the deposit at 5 per cent and sets percentages at base, frame, enclosed, fixing and completion stages.
Victoria currently caps the deposit at 5 per cent for contracts of $20,000 or more, with set payment stages. A new Victorian Act, which lets regulations set deposit limits and payment stages, is due to start on 31 March 2027, after being deferred. Details of the final regulations were not confirmed at the time of writing, so check the current position with Consumer Affairs Victoria before signing.
I have not listed the ACT because no fixed deposit limit or prescribed schedule applies there that we can point you to. Ask your builder and your lender how payments will be set.
A payment made early or above what the contract allows can reduce your insurance protection. In Queensland, for example, this can weaken cover under the Home Warranty Scheme. Home warranty or indemnity insurance certificates are also typically required before a builder can ask for a payment, so check that paperwork is in hand before the deposit goes out.
Ready to get started?
Book a chat with a Finance & Mortgage Broker at Granny Flat Loans today.
How a Progress Draw Changes Your Repayments
During a build you generally pay interest only on the amount drawn, so repayments grow with each stage. In NSW, government guidance notes that repayments begin once the first progress payment is made and you start drawing down.
As an example, consider a borrower with a construction loan limit of $400,000 and a fixed price building contract. At the base stage, the registered builder claims $40,000 and the lender releases it after a progress inspection. At an illustrative rate of 6.75% p.a., interest on $40,000 is about $2,700 a year, or roughly $225 a month.
By the time the frame stage is paid, total drawings reach $120,000. Interest at the same illustrative rate is then about $8,100 a year, or around $675 a month. The borrower knew this in advance, set aside funds for each step and was not surprised when the repayment tripled. The lesson is to map each draw against a monthly figure before building starts. Our mortgage repayment calculator lets you test your own numbers.
The trade-off is that costs can rise if the build runs over time or the contract changes. Some lenders charge a fee for each progress inspection or drawdown. In NSW, Building Commission NSW gives $250 to $500 as an indicative cost for each progress inspection, so ask your lender what applies to you.
Tax Rules for Interest During a Build
If you are building to rent out, the tax treatment of your interest depends on how your loans are structured. Speak with your accountant before you finalise your loan structure, because outcomes depend on your circumstances.
The ATO says holding costs for vacant land, including interest on money borrowed to buy the land, cannot be claimed while the land stays vacant. Interest on borrowings for the construction itself is treated differently, and can be claimed in a case where land and construction are on separate loans. Where one loan covers both, interest has to be apportioned. This is one reason borrowers sometimes look at a split loan for granny flat construction, though a split structure adds some complexity and may carry extra fees.
Frequently Asked Questions
Is there a separate law for construction loans in Australia?
No separate law governs construction loans as a product. They are regulated through general credit and prudential rules, while state and territory building laws shape the payments they fund.
Do banks still assess serviceability for a construction loan?
Yes. Banks must assess whether you can meet repayments at a rate at least 3 percentage points above the loan rate. The debt-to-income limit exempts construction of new dwellings, but that does not remove the serviceability check.
When do repayments start on a construction loan?
In NSW, government guidance says repayments start once the first progress payment is made and you begin drawing down. Repayment type during the build varies by lender, so confirm it in writing.
Can I claim interest on a construction loan for a rental property?
The ATO treats interest on construction borrowings differently from interest on borrowings to buy vacant land. Your outcome depends on how your loans are structured, so check with your accountant.